BOM Requirements Report (MCR730)

Use this program to print up to five time periods of bill of material quantity requirements based on planned production. You can print a listing of what is required to produce and what components are needed based on all planned production that has been entered in the BOM Planned Production Entry program. At the end of the report, you can remove the planned production information, convert it to production or leave requirements alone.

You have these options:

Reports include this information.

Click field descriptions for information on each field.