Use the following fields to create company MC non-static control record.
1. Current MC Period
Specify the current MC period or period when actual processing in MC will begin (PPYY). Pressing Enter defaults to the current GL period. After initial entry, this field is updated by the MC End-of-Period Update program. The period entered must be in the current or next GL period.
2. Date Last End-Of-Period Update
Specify the date of the last End-of-Period Update in manufacturing. Pressing7 Enter defaults to 010100. After initial entry, this field will be updated by the End-of-Period Update program.
*3-6. Ticket and Register Numbers
These numbers keep track of the last tickets and register numbers used. As a register is updated, the last number used is incremented by one. Upon installation, these fields should be set to 0. These fields are automatically updated through normal processing. Pressing Enter initially defaults to 0.
* indicates that changing the field after initial installation can have serious repercussions.
Please refer to your affiliate before any changes are made.