You are here: Manufacturing Control > Bill of Materials > Production Entry (MCE130)

Production Entry (MCE130)

How to

Use this program to enter production tickets for bill of material finished items.

Processing details

The Production Entry screen consists of the header portion, where the finished item number, number of units to be produced, etc. are entered, and the line-item portion where the component items, number of units required, etc. are entered.

You have the option of changing, adding to, removing line-items from or deleting the production ticket at any time. Deleted production ticket numbers can be used again.

A number of additional features are available in the Production Entry program:

Existing production planning for the bill of material finished item can be displayed. Production tickets are available for printing using the Production Ticket Print. Production tickets can later be confirmed and a register can be run to update on-hand quantities.

Click Manufacturing Control>Bill of Materials>Production Entry to access this program.

Click field descriptions for information on each field.

EWMS processing note

The Production Entry (MCE130) program checks to determine if the production ticket you are going to change has been waved by Radio Beacon. If is has you will not be able to modify it, if it has not, the system sends a ‘nuke’ record to Radio Beacon causing this ticket to be removed. It will then need to be reprinted in order to get it sent back down to Radio Beacon.

See also

Entering production tickets for bill of material finished items

Changing or deleting finished items from production tickets

Adding finished items to the production ticket