Production Entry (MCE130)

How to

Use this program to enter production tickets for bill of material finished items.

Processing details

The Production Entry screen consists of the header portion, where the finished item number, number of units to be produced, and so on are entered, and the line-item portion where the component items, number of units required, and so on are entered.

You can change or delete the production ticket at any time. Deleted production ticket numbers can be used again.

These features are available:

Production planning for the bill of material finished item can be displayed. Production tickets are available for printing using the Production Ticket Print. Production tickets can later be confirmed and a register can be run to update on-hand quantities.

The planned special order and line number are displayed above the ticket number.

Click Manufacturing Control>Bill of Materials>Production Entry to access this program.

Click field descriptions for information on each field.

Document notes

Document and lines notes are available. Toggle notes to import them from existing BOM notes. Notes are printable and are stored with the BOM.

MC Side Bar

After you specify an item or ticket, the MC Side Bar is available from the entry grid to display additional information for component items. It is tailored for quick item selection and viewing details about manufacturing habits for the specified finished item to facilitate efficient manufacturing choices. Click Side Bar Details for more information.

EWMS processing

The Production Entry (MCE130) program checks to determine if the production ticket you are going to change has been received by Radio Beacon. If it has you will not be able to modify it, if it has not, the system sends a ‘nuke’ record to Radio Beacon causing this ticket to be removed. Then reprint it to send to Radio Beacon.

See also

Entering production tickets for bill of material finished items

Changing or deleting finished items from production tickets

Adding finished items to the production ticket