These reports are available for Manufacturing Control:
The Bill of Materials Listing, which is used to print a report of bill of material finished items and the component and costing information associated with each finished item.
The BOM Open Production Report, which is used to print a report listing by ticket (or item) the production tickets in process.
The BOM Requirements Report, which is used to print a report listing up to five time periods (months) of bill of material quantity requirements based on planned production.
The BOM Cost Change Analysis Report, which is used to print a list of new costs of BOM items if component costs are changed. It allows users to analyze how component cost changes affect total costs.
The BOM Past Production Report, which is used to print a report of all past BOM production tickets in process. The report includes this information for each production ticket: ticket number, planned date, status (E-entered, P-printed, C-confirmed), warehouse, finished item number and description(s), units, stocking unit of measure, on hand, on order and committed quantities (of the finished item). The total number of tickets printed is also included.
The Formula Listing, which is used to print a report of formulas and the ingredients, finished items, packaging items and costing information associated with code finished item.
The Formulation Open Production Report, which is used to print a report listing by ticket (or formula), the production tickets in process.
The Formulation Requirements Report, which is used to print a report listing up to five time periods of formulation quantity requirements based on planned production.
The Formulation Usage Cost Change Analysis Report, which is used to print a list of new costs of formulas if component costs (packaging and/or ingredient items) are changed. It allows users to analyze how component cost changes affect total costs.
Th FML Past Production Report, which is used to print a report of all past formulation production tickets. Report information includes this information for each formulation production ticket: ticket number, date, status (E-entered, P-printed, C-confirmed), warehouse, formula number and description, each finished item, the item number and description, units, stocking unit of measure, on hand, on order and committed quantities (of the finished item). The total number of tickets printed is also included.