Production Entry (MCE130)

How To

This program allows you to enter production tickets for bill of material finished items.

Processing Details

The Production Entry screen consists of two sections. The upper portion of the screen is called the header portion where the finished item number, number of units to be produced, etc. are entered. The lower portion is called the line-item portion where the component items, number of units required, etc. are entered.

The user has the option of changing, adding to, removing line-items from or deleting the production ticket at any time. Deleted production ticket numbers may be used again.

A number of additional features are available in the Production Entry program:

Existing production planning for the bill of material finished item may be displayed. Production tickets are available for printing using the Production Ticket Print. Production tickets may later be confirmed and a register may be run to update on-hand quantities.

EWMS Processing Note

The Production Entry (MCE130) program checks to determine if the production ticket you are going to change has been waved by Radio Beacon. If is has you will not be able to modify it, if it has not, the system sends a ‘nuke’ record to Radio Beacon causing this ticket to be removed. It will then need to be reprinted in order to get it sent back down to Radio Beacon.

 

Access this program by choosing Manufacturing Control-->Bill of Materials-->Production Entry.

 

User Fields

The following fields are involved in entering production tickets for bill of material finished items:

1. Doc/ Finished Item

Enter the number of the ticket (1-999999), the item number or finished item number. Press Enter to assign the next number on file. NEXT is displayed as the ticket number until the header portion of the ticket is complete and the actual ticket number is assigned and displayed. Press F1 or the first image\find_shg.gif for a finished item search. Press F2 or the second image\find_shg.gif to search for items. Press F3 or image\opendoc_shg.gif to search for production tickets already set up.

2. Whse

Enter the warehouse to produce the finished item (i.e., all component items will come from this warehouse). Press Enter (CR) to default to the warehouse assigned to the terminal. Press F2 or image\find_shg.gif to search.

3. Entered

Enter the date of the production entry Press Enter (CR) to default to the system date.

4. Production

Enter the planned production date, i.e., date production is scheduled to take place. Press Enter (CR) to default to the system date.

5. Units

Enter the number of units to produce. Press Enter (CR) to display the production planning lines for the finished item being entered. On hand, on order, committed quantities and the stocking units of measure are displayed in the line-item section of the screen.

This concludes the header portion of the production entry program. At this time, a ticket number is automatically assigned and displayed. After the header record is created, all header fields except #1-3 are accessible through the change header routine. Fields #1-3 can only be changed by deleting and reentering the production ticket.

Upon completion of the header, the on-order quantities are updated for the warehouse for the BOM finished item.

Line numbers are assigned automatically beginning with 001 and incrementing by one for each additional line-item up to 999.

Upon completion of the header, the program automatically displays the required component line-items. The units required of the component items are calculated based on the number of finished units entered in the header. Once the component line-items are added, the committed quantities are updated in the warehouse for those component items.

You can select from the following to perform the listed functions:

image\edit_shg.gif - Changes a line-item

image\plus_shg.gif  - Adds line-items

image\insert_shg.gif  - Inserts line-items

image\Delete_shg.gif  - Deletes line-items

image\stop_shg.gif   Stops line-item entry

image\noteitemon.gif- Accesses Note Entry (SME710) for the item highlighted in BOM line item browser.

image\noteardcon.gif- Accesses Note Entry (SME710) for the BOM document line record highlighted in the line item browser.

Done     End the Bill of Materials Entry

To add a component line click image\plus_shg.gif and enter:

6. Component Item

Enter the component item number, press F2 or image\find_shg.gif to search.

Enter the component item number to be used to produce the bill of material finished item. The entry must be a valid number. Valid entries display the item description and stocking unit of measure.

To enter a memo, enter M and the Memo field becomes available.

7. Description

The system displays the item description.

8. Units

Enter the number of units needed to produce one finished item.

9. UM

The system displays the stocking UM for the item as the default.

10. Memo

Enter the memo for the component item to appear on the production tickets (up to 20 characters).

Press image\save_shg.gif to save your changes

This concludes the line-item portion of the Bill of Materials Entry.

See Also

How to enter production tickets for bill of material finished items

How to change or delete finished items from production tickets

How to add finished items to the production ticket