BOM Cost Change Analysis (MCR740)

This program allows the user of the FACTS system to enter new costs for component items and the system calculates what effect those new costs have on the final cost of the BOM item it is used to produce. It allows users to analyze how component cost changes affect their total costs.

The user has the option to:

Report information includes the following: component item(s) entered and their new cost and the costing unit of measure. For each BOM item, the item number and description, price, pricing unit of measure, current and new cost, costing unit of measure, $ difference and the percentage (%) change are printed. The total number of BOM items listed is also included.

Use the following fields to print the Bill of Materials Cost Change Analysis:

1. Beginning Item

Enter the beginning finished item to print. Press Enter (CR) to default to FIRST.

2. Ending Item

Enter the ending finished item to print. Press Enter (CR) to default to LAST.

3. Item Description

Enter whether to print item description 1, 2 or B-both as set in the Item F/M. Press Enter (CR) to default to 1.

4. Cost

Enter whether to use S-standard, A-average, L-last or M-manual cost calculations. Press Enter (CR) to default to S.

5. Warehouse

If M is entered in field #4, this field is skipped. If S, A or L is entered in field #4, enter the warehouse to retrieve the cost from. The entry must be a valid warehouse. Press Enter (CR) to default to the warehouse assigned to the terminal

6. Component 1-6

Enter the item (component) number with a cost change. F3 ends entry of component items with cost changes. The current cost is displayed. Enter the new cost.